Permitting requirements in Ontario are strict for a reason: they protect safety, resale value, and insurance eligibility. Missing a permit can delay a project or create expensive fixes at resale.
Common Renovations That Require Permits
- Structural changes such as removing walls or adding beams
- Basement finishing that creates new bedrooms or bathrooms
- Additions, including rear and side extensions
- Plumbing changes that relocate fixtures or drains
- Electrical upgrades that add circuits or panels
Typical Permit Timelines in the GTA
Simple interior permits can take 2 to 6 weeks. Larger additions and structural work can take 6 to 12 weeks, especially when engineering drawings or zoning reviews are required.
Inspections That Affect Scheduling
Rough framing, plumbing, electrical, and insulation inspections can pause work if trades are not coordinated. Build inspection windows into the schedule and keep drawings and site photos organized for quick approvals.

How to Avoid Permit Delays
- Finalize scope before submitting applications
- Use clear architectural and engineering drawings
- Align design with Ontario Building Code requirements
- Plan inspections in the schedule, not as an afterthought
The best timeline protection is early planning. Experienced contractors coordinate the permit package and schedule inspections so construction can move without surprises.
What You Need Before Applying
- Clear scope notes and floor plans that match the proposed work
- Engineering details for structural changes or additions
- Product specs for critical assemblies when required
- A realistic construction timeline that includes inspections
What Happens if You Skip Permits
Unpermitted work can delay resale, void insurance coverage, and require costly tear-outs if inspectors flag issues later. The cost of proper permits is usually far less than the cost of rework.
Permit vs. Minor Repair
Cosmetic changes like painting, flooring replacement, and cabinet refacing rarely need permits. The moment you touch structure, plumbing, or electrical, the permit conversation starts.
Ready to plan your renovation? Book a consultation with EZU Construction to get a detailed scope, timeline, and budget you can trust.
Ready to plan your renovation?
Get a clear scope, realistic timeline, and detailed budget from the EZU Construction team.
Book a Consultation