Tile Installation and Repair

Expert tile work for floors, walls, and backsplashes that lasts.

Professional tile installation and repair services for bathrooms, kitchens, and throughout your home. Our skilled tile setters ensure precise installation, beautiful patterns, and long-lasting results.

Why Choose Our Tile Services?

Why Choose Our Tile Services?

  • -Expert installation of all tile types
  • -Precise cutting and pattern work
  • -Professional grouting and sealing
  • -Beautiful backsplash and feature wall designs
  • -Comprehensive repair and restoration

Tile Installation and Repair Options

Bathroom Tile

Bathroom Tile

Waterproof tile installation for showers, floors, and walls with proper waterproofing systems.

Kitchen Backsplashes

Kitchen Backsplashes

Beautiful backsplash installations with intricate patterns and modern designs.

Floor Tile

Floor Tile

Durable floor tile installation for high-traffic areas with proper subfloor preparation.

Essential Considerations

Waterproofing

Proper waterproofing is essential in wet areas. We install appropriate membranes and systems to prevent water damage and ensure long-lasting results.

Substrate Preparation

Proper surface preparation ensures tiles adhere correctly and remain level. We assess and prepare substrates to meet manufacturer specifications.

Layout & Pattern Design

Thoughtful layout planning ensures balanced patterns, minimal cuts, and optimal visual appeal. We work with you to create beautiful designs.

Grout & Sealing

Professional grouting and sealing protect your investment. We use appropriate grout types and sealers based on the tile and application.

Our Tile Installation and Repair Process

  • Design Consultation

    We discuss your tile preferences, patterns, and design goals. We help you select tiles, grout colors, and create a layout plan that maximizes visual appeal.



  • Surface Preparation

    Thorough preparation of surfaces including waterproofing where needed, substrate leveling, and ensuring proper conditions for tile installation.



  • Precise Installation

    Expert tile installation with precise cutting, spacing, and alignment. We ensure proper adhesive application and follow manufacturer specifications.



  • Grouting & Finishing

    Professional grouting with appropriate materials, followed by cleaning and sealing where necessary to protect and enhance the finished appearance.



  • Final Inspection & Care

    Comprehensive inspection and detailed care instructions. We ensure every detail is perfect and provide guidance on maintaining your new tile work.


Our Recent Tile Installation and Repair Projects

Beautiful modern bathroom with tile walls and floor

Modern Bathroom Tile

Complete bathroom tile installation with waterproofing and modern design patterns.

View Project
Intricate kitchen backsplash tile work

Kitchen Backsplash

Custom backsplash installation with intricate patterns and premium materials.

View Project
Restored tile floors with new grout

Tile Floor Restoration

Expert tile and grout repair to restore old floors to like-new condition.

View Project

Tile Installation and Repair FAQ

What types of tile do you install?
We install ceramic, porcelain, natural stone (marble, granite, travertine), glass, and mosaic tiles for floors, walls, and backsplashes. We can help you choose the best option for your space.
How long does tile installation take?
Timeline depends on the project scope. A bathroom might take 3-5 days, a kitchen backsplash 1-2 days, and larger floor installations 1-2 weeks. We provide detailed timelines for your project.
Do you provide waterproofing?
Yes, we provide comprehensive waterproofing for wet areas like showers and bathrooms. We use industry-standard waterproofing membranes and systems to ensure long-lasting protection.
Can you repair damaged tiles?
Absolutely. We can replace individual tiles, repair grout, and restore tile surfaces. We'll match existing tiles when possible and ensure seamless repairs.
What's included in tile installation?
Our service includes surface preparation, waterproofing (where needed), tile installation, grouting, sealing (where applicable), and cleanup. We handle all materials and ensure proper installation techniques.

Let's make your dream a reality.

Ready to transform your space? Our expert team is standing by to bring your vision to life with quality craftsmanship and exceptional service.

or call us at (647) 766-9999
Free Consultation
No Obligation
Fast Response
Call UsFree Quote