Your next
home.
Custom homes and renovations built to last. We specialize in new home builds, kitchen and bathroom remodels, and whole-home upgrades. Designed for modern living.
Recent work
Custom homes and renovations delivered by our team across the Greater Toronto Area.
What we build
Our team has built and renovated complete homes from the foundation up. That experience informs every project we take on: we know how each trade depends on the last, and we work with the most capable specialists in the GTA.
-
Custom homes
New homes built on your lot, from feasibility and drawings to the final walkthrough.
-
Home additions
Second storeys, rear extensions and garage conversions that look like they were always there.
-
Whole-home renovations
Gut renovations and layout changes for houses that have good bones and the wrong floor plan.
-
Kitchen renovations
Kitchens planned around how you cook, including wok and second kitchens with ventilation that works.
-
Bathroom renovations
Bathrooms waterproofed properly, ventilated properly and finished to last.
-
Basements and second suites
Finished basements and legal second units, with waterproofing, egress and fire separation done right.
-
Laneway and garden suites
Detached backyard homes for family or rental income, from eligibility check to occupancy.
-
Trades and repairs
Drywall, flooring, tile, painting, interlock and more, done by the specialists we trust.
Before and after
The same rooms, transformed by our team.
Same room, same footprint. The layout stayed; the storage, island and finishes didn’t. See the project
Flooring now runs continuously from the entry through the kitchen. See the project
An unused lower level turned into a family games room. See the project
Closed-in rooms opened into one bright living and dining space. See the project
How a project works
Five defined stages, one accountable team, from the first site visit to final sign-off.
- 01 / 05
Consultation and site visit
We meet at your home to understand your goals, assess the structure and mechanical systems, and outline what can be achieved within your budget.
- 02 / 05
Design and written quote
Drawings, selections and an itemized quote. Items not yet selected are listed as stated allowances, and every payment in the contract is tied to completed work.
- 03 / 05
Permits and preparation
We manage engineering, permit applications and utility locates, and order long-lead materials early so the schedule never waits on a delivery.
- 04 / 05
Construction
Your project manager coordinates every trade and inspection and sends a written progress update each week. Any change is priced and approved in writing before work proceeds.
- 05 / 05
Handover and warranty
We walk the finished project with you, resolve every deficiency and provide your warranty documents. After you move in, our team remains your point of contact.
Why our work carries a seal
In Chinese tradition, a seal is a signature. In Ontario, an engineer’s seal on a drawing means a qualified person stands behind it. Ours means the same thing.
At completion, our team walks the finished work with you, resolves every deficiency and signs the project off. The character on our seal is 筑, “to build”.
Where we build
Headquartered in Markham, we serve Toronto, York Region and the wider Greater Toronto Area.
我们可以用普通话沟通。查看中文介绍
Guides and insights
Practical guidance on costs, timelines and permits from the projects we deliver.
-
Suites and units Use your mortgage to pay for a basement or garden suite CMHC-insured refinancing lets GTA homeowners borrow up to 90% of a home’s value once a suite is built. Plus: the $80,000 federal suite loan isn’t available. -
Permits and rules Find out how many units you can build on your GTA lot in 2026 Basement suites, garden suites, multiplexes and sixplexes: what Toronto, Markham, Richmond Hill and Vaughan allow in 2026, including Markham’s fourplex veto. -
Costs Get up to $6,650 to protect your Toronto basement from flooding Toronto raised its basement flooding subsidy in 2026: backwater valves, sump pumps, battery backup and a plumbing assessment. What’s covered and how to claim. -
Planning Building through a GTA winter, and what changes and what doesn’t Which construction and renovation work carries on through a Toronto winter, what needs extra care, how it affects cost and schedule, and how to plan around it.
Have a project in mind?
Book a consultation with our team. We’ll assess your home, review the options with you and follow up with a detailed written quote.







