Bathroom renovations

Bathrooms waterproofed properly, ventilated properly and finished to last.

Renovated bathroom with shaker vanity, marble-look quartz top, black fixtures and walnut slat wall
A finished EZU project.

Most of what makes a bathroom last is invisible once it’s finished: the waterproofing membrane behind the tile, the slope of the shower floor, the size of the exhaust fan and where it vents. Those are the parts we spend the most care on, because they’re the most expensive to redo.

The visible parts matter too: a vanity at the right height, tile laid out so cuts land where they should, niches where the bottles actually go, and lighting at the mirror rather than only overhead.

Bathroom with a freestanding tub and marble-look walls

What we take care of

All of it under one contract, managed by a dedicated project team.

  • Waterproofing

    Sheet or liquid membranes on shower walls and floors, tested before tile goes on.

  • Showers

    Curbless and low-curb walk-in showers with linear or point drains, niches and frameless glass.

  • Heated floors

    Electric radiant heat under tile on its own thermostat.

  • Vanities and storage

    Custom or furniture-style vanities, medicine cabinets and linen storage.

  • Ventilation

    Exhaust fans sized to the room, ducted outside, on a timer or humidity control.

  • Accessibility

    Blocking for grab bars, wider doors, and barrier-free showers for aging in place.

How your project runs

Five defined stages, from the first site visit to final sign-off.

  1. 01 / 05

    Consultation and site visit

    We meet at your home to understand your goals, assess the structure and mechanical systems, and outline what can be achieved within your budget.

  2. 02 / 05

    Design and written quote

    Drawings, selections and an itemized quote. Items not yet selected are listed as stated allowances, and every payment in the contract is tied to completed work.

  3. 03 / 05

    Permits and preparation

    We manage engineering, permit applications and utility locates, and order long-lead materials early so the schedule never waits on a delivery.

  4. 04 / 05

    Construction

    Your project manager coordinates every trade and inspection and sends a written progress update each week. Any change is priced and approved in writing before work proceeds.

  5. 05 / 05

    Handover and warranty

    We walk the finished project with you, resolve every deficiency and provide your warranty documents. After you move in, our team remains your point of contact.

How long it takes

Typical for this kind of project in the GTA. Permits are the least predictable part, especially if a variance is needed.

  1. Design and selections 2–4 wk
  2. Ordering 2–4 wk
  3. On site 3–5 wk
Typical overall: 7–13 weeks.

Good to know before you start

  • Tile isn’t waterproof

    Grout and tile let water through. The membrane underneath does the work, so ask how it’s installed and whether it’s flood-tested.

  • Fans are often undersized

    A fan that’s too small, or that vents into the attic, leads to mould. We size and duct fans properly.

  • Moving the toilet costs more

    Relocating a toilet means moving a large drain. It’s possible, but it’s the single biggest cost driver in a bathroom layout change.

Common questions

How long does a bathroom renovation take?

Three to five weeks on site for most bathrooms, once selections are made and long-lead items like vanities and custom glass have arrived. We order early so the room never sits half finished waiting on a delivery.

Is a curbless shower worth it?

For a primary bathroom, usually yes. It looks clean, it’s easier to clean, and it works at every stage of life. It needs careful floor framing and waterproofing, which are built into the price.

Do I need a permit for a bathroom?

Replacing fixtures in the same location usually doesn’t. Adding a new bathroom, moving drains or changing walls generally does, and we handle the application and inspections when it’s needed.

How do you prevent leaks and mould?

With a continuous waterproofing membrane behind the tile, properly sloped floors, and an exhaust fan sized for the room and ducted outdoors. These are the parts you never see, and the ones we take the most care over.

Can you add heated floors?

Yes. Electric radiant heat under tile is affordable to install during a renovation and runs on its own thermostat. It’s one of the most appreciated upgrades in a primary bathroom.

Do you renovate condo bathrooms?

Yes. Condo work involves building management approval, elevator bookings and restricted working hours, and we plan around all of them from the start.

Tell us about your bathroom

Have a question we didn’t cover? Our team is happy to talk it through.

Have a project in mind?

Book a consultation with our team. We’ll assess your home, review the options with you and follow up with a detailed written quote.