Kitchen renovations

Kitchens planned around how you cook, including wok and second kitchens with ventilation that works.

White shaker kitchen with quartz waterfall island and white oak hood, Etobicoke
A finished EZU project.

A kitchen is the most expensive room per square foot in a house and the one used most, so the layout matters more than the finishes. We start with how you cook and who is in the room: where the groceries land, where things are washed, prepped and cooked, where children do homework, and how much heat and smoke the cooking produces.

Then we build it: demolition, any wall or plumbing changes, electrical and lighting, cabinetry, stone, tile, ventilation and appliances, by trades who install kitchens every week.

White kitchen with tall cabinetry and a long island with a dark stone top
Our Richmond Hill kitchen renovation.

What we take care of

All of it under one contract, managed by a dedicated project team.

  • Layout and plan

    Clearances, work zones, storage and seating worked out to scale before anything is ordered.

  • Cabinetry

    Custom or semi-custom cabinetry, including full-height pantry walls, integrated appliance panels and interior lighting.

  • Stone and backsplash

    Quartz, porcelain slab or natural stone, including full-height slab backsplashes and waterfall islands.

  • Ventilation

    Hoods sized for real cooking and ducted outside, with make-up air where the code requires it.

  • Wok and second kitchens

    A separate high-heat cooking room or spice kitchen with its own exhaust, so the main kitchen stays clean.

  • Lighting and electrical

    Dedicated circuits, under-cabinet and interior lighting, and enough outlets in the right places.

How your project runs

Five defined stages, from the first site visit to final sign-off.

  1. 01 / 05

    Consultation and site visit

    We meet at your home to understand your goals, assess the structure and mechanical systems, and outline what can be achieved within your budget.

  2. 02 / 05

    Design and written quote

    Drawings, selections and an itemized quote. Items not yet selected are listed as stated allowances, and every payment in the contract is tied to completed work.

  3. 03 / 05

    Permits and preparation

    We manage engineering, permit applications and utility locates, and order long-lead materials early so the schedule never waits on a delivery.

  4. 04 / 05

    Construction

    Your project manager coordinates every trade and inspection and sends a written progress update each week. Any change is priced and approved in writing before work proceeds.

  5. 05 / 05

    Handover and warranty

    We walk the finished project with you, resolve every deficiency and provide your warranty documents. After you move in, our team remains your point of contact.

How long it takes

Typical for this kind of project in the GTA. Permits are the least predictable part, especially if a variance is needed.

  1. Design and selections 3–6 wk
  2. Cabinet lead time 4–8 wk
  3. On site 5–9 wk
Typical overall: 12–23 weeks.

Good to know before you start

  • Cabinets set the schedule

    Cabinetry is usually the longest lead item. We finalize the cabinet drawings early and do demolition and rough-in while it’s being made.

  • Big hoods need make-up air

    High-capacity range hoods can depressurize a house and pull exhaust from gas appliances. Where the code requires it, we add make-up air that’s interlocked with the hood.

  • A permit may be needed

    A cosmetic kitchen usually doesn’t need a building permit. Removing a wall, moving plumbing or adding a gas line does.

Common questions

How long will we be without a kitchen?

Usually five to nine weeks on site, depending on layout changes and cabinet lead times. We can set up a temporary sink and counter elsewhere in the house so you can still make coffee and wash dishes.

Can you build a wok kitchen?

Yes. A wok kitchen or spice kitchen needs its own ventilation plan: a high-capacity hood ducted outside, fire-resistant finishes, and make-up air where the code requires it. Our wok kitchen guide covers the details, and we can plan it alongside the main kitchen.

Do you supply the cabinets, or can we buy our own?

Either. We work with cabinet makers we trust, and we also install cabinetry clients source themselves, provided we review the drawings and site measurements before the order is placed.

Quartz or natural stone?

Quartz is more forgiving day to day and resists stains. Natural stone like marble or quartzite has a depth quartz can’t replicate but needs sealing and care. We show you full slabs of both before you choose.

Can you move the sink, the range or a wall?

Usually, yes. Moving plumbing, gas or a load-bearing wall adds cost and sometimes a permit, so we confirm what’s behind the walls and price each option before you commit.

Do you help with design?

Yes. We plan the layout with you around how you cook and use the room, then work through cabinetry, counters, lighting and appliances with our cabinet and stone partners.

Start your kitchen consultation

Have a question we didn’t cover? Our team is happy to talk it through.

Have a project in mind?

Book a consultation with our team. We’ll assess your home, review the options with you and follow up with a detailed written quote.