Accessibility
We want everyone to be able to use this website, including people who use screen readers, keyboards, magnification or other assistive technology. We build it to the Web Content Accessibility Guidelines (WCAG) 2.1 level AA, in the spirit of Ontario’s Accessibility for Ontarians with Disabilities Act.
What we’ve done
- Text and controls meet colour contrast guidelines.
- Every page works with a keyboard, with a visible focus outline and a skip link.
- Images have text descriptions, and before-and-after photos are labelled.
- The site respects your device’s reduced-motion setting.
- Pages use standard HTML headings, lists and form labels.
Tell us about a barrier
If something on this site doesn’t work for you, or you need information in another format, call (647) 766-9999 or email info@ezuconstruction.ca. We’ll respond and help.
On site
We also design and build for accessibility: barrier-free showers, wider doorways, ramps, main-floor bedrooms and in-law suites. See our guide to designing a multigenerational home.







