Custom homes

New homes built on your lot, from feasibility and drawings to the final walkthrough.

Contemporary two-storey custom home in Richmond Hill with panel cladding, black-framed windows and a glass balcony
A finished EZU project.

Most custom homes in the GTA are built on an existing lot: an older bungalow comes down and a new house goes up within the zoning envelope the city allows. That makes the first months the most important. What you can build is set by the zoning by-law, the trees on and near the lot, the grading, the services in the street and sometimes a heritage district, long before anyone picks a tile.

We run the whole sequence: feasibility, design with your architect or ours, engineering, permits, demolition, construction and the trades in between. You deal with one team that has built houses from the footings up, and a dedicated project manager responsible for the schedule and the budget.

Stone and stucco custom home with arched dormers and a covered entry
Our stone and stucco custom home in Richmond Hill.

What we take care of

All of it under one contract, managed by a dedicated project team.

  • Lot feasibility

    Zoning, setbacks, height, coverage, trees, grading and services checked before you commit to a design.

  • Design and drawings

    Architectural, structural and mechanical drawings, coordinated so what’s drawn can be built at the quoted price.

  • Permits and approvals

    Building permit, demolition permit, tree permits, utility disconnects and, if needed, a Committee of Adjustment application.

  • Construction

    Excavation and foundations through framing, roofing, mechanicals, insulation, drywall and finishes, with inspections at each stage.

  • Selections

    A selections schedule that tells you when each decision is needed so long-lead items like windows and cabinetry never hold up the site.

  • Warranty and handover

    Final walkthrough, deficiency list, manuals and warranty registration for new-home coverage.

How your project runs

Five defined stages, from the first site visit to final sign-off.

  1. 01 / 05

    Consultation and site visit

    We meet at your home to understand your goals, assess the structure and mechanical systems, and outline what can be achieved within your budget.

  2. 02 / 05

    Design and written quote

    Drawings, selections and an itemized quote. Items not yet selected are listed as stated allowances, and every payment in the contract is tied to completed work.

  3. 03 / 05

    Permits and preparation

    We manage engineering, permit applications and utility locates, and order long-lead materials early so the schedule never waits on a delivery.

  4. 04 / 05

    Construction

    Your project manager coordinates every trade and inspection and sends a written progress update each week. Any change is priced and approved in writing before work proceeds.

  5. 05 / 05

    Handover and warranty

    We walk the finished project with you, resolve every deficiency and provide your warranty documents. After you move in, our team remains your point of contact.

How long it takes

Typical for this kind of project in the GTA. Permits are the least predictable part, especially if a variance is needed.

  1. Feasibility and design 10–20 wk
  2. Permits 8–20 wk
  3. Construction 40–60 wk
Typical overall: 58–100 weeks.

Good to know before you start

  • New-home warranty applies

    A new house built for you on your land is covered by Ontario’s statutory new-home warranty, and the builder must be licensed by the HCRA. Ask any builder for their licence number and check it on the Ontario Builder Directory.

  • Trees decide more than you think

    Protected trees on your lot or a neighbour’s can move the footprint, the driveway and the excavation. A tree survey early in design avoids redesigning after the permit review.

  • Minor variances add months

    Building within the zoning envelope keeps the permit simple. Going over on height, coverage or setbacks means a Committee of Adjustment hearing, usually three to six months.

Common questions

Do I need my own architect?

No. Many clients arrive with an architect or designer they already like, and we build from their drawings and review them early for cost and buildability. If you don’t have one, we bring in a designer and structural engineer we work with regularly and manage the drawings as part of the project, so one team is responsible from concept to keys.

Can you build on a lot I already own?

Yes. Most of our custom homes are built on lots our clients already own, often replacing an older house. We start with a feasibility review of zoning, setbacks, height limits, trees and servicing, so you know what can be built before you pay for full drawings.

Ask us to review your lot

How is the price set?

Once drawings and selections are far enough along, you receive a written, itemized price. Anything not yet chosen is listed as an allowance with the amount stated, so you can see exactly where the number can move. Payments are tied to completed stages of work, never to dates.

How long does a custom home take?

Typically 10 to 20 weeks of design and feasibility, 8 to 20 weeks for permits, and 10 to 14 months of construction. Permits vary the most, especially if a minor variance is needed. We give you a realistic schedule at the start and update it every week.

Can we visit the site during construction?

Yes, and we encourage it. Visits are scheduled with your project manager so someone walks you through progress and the decisions coming up. You also receive a written update with photos every week.

Is a new custom home covered by a warranty?

Yes. A new home built for you on your land is enrolled in Ontario’s statutory new-home warranty, and we add our own written workmanship warranty. We handle the enrolment and paperwork before construction begins.

Talk to us about your build

Have a question we didn’t cover? Our team is happy to talk it through.

Have a project in mind?

Book a consultation with our team. We’ll assess your home, review the options with you and follow up with a detailed written quote.