Not sure of your needs? See all services or contact us.

Basements and second suites

Finished basements and legal second units, with waterproofing, egress and fire separation done right.

Finished lower-level family room with light plank flooring
A finished EZU project.

A basement is either the most affordable square footage in your house or the most expensive mistake, and the difference is moisture. We start by finding where water gets in, or could, and deal with it before a single stud goes up.

From there it depends on the goal. A family room or gym needs good insulation, lighting and ceiling height. A legal second unit needs more: a separate entrance, egress windows, fire separation, interconnected alarms and a building permit. Since 2022, Ontario allows a second and third unit on most residential lots as of right, which makes a legal suite one of the most useful renovations you can do.

Finished basement with a new stair, pot lights and vinyl plank flooring

What we take care of

All of it under one contract, managed by a dedicated project team.

  • Moisture assessment

    Grading, downspouts, foundation cracks, sump and drainage checked first, with interior or exterior waterproofing if needed.

  • Insulation and framing

    Foundation walls insulated and framed to keep the basement dry and warm, with moisture-tolerant materials at the floor.

  • Legal second units

    Separate entrance, egress windows, fire separation, smoke and CO alarms, and the permit, for a unit you can rent or give to family.

  • Ceiling height

    Underpinning or bench footings where the existing height is too low for living space.

  • Bathrooms and kitchens

    Below-grade plumbing, including ejector pumps where drains can’t run by gravity.

  • Finishes

    Flooring, drywall, lighting and millwork that make it feel like part of the house.

How your project runs

Five defined stages, from the first site visit to final sign-off.

  1. 01 / 05

    Consultation and site visit

    We meet at your home to understand your goals, assess the structure and mechanical systems, and outline what can be achieved within your budget.

  2. 02 / 05

    Design and written quote

    Drawings, selections and an itemized quote. Items not yet selected are listed as stated allowances, and every payment in the contract is tied to completed work.

  3. 03 / 05

    Permits and preparation

    We manage engineering, permit applications and utility locates, and order long-lead materials early so the schedule never waits on a delivery.

  4. 04 / 05

    Construction

    Your project manager coordinates every trade and inspection and sends a written progress update each week. Any change is priced and approved in writing before work proceeds.

  5. 05 / 05

    Handover and warranty

    We walk the finished project with you, resolve every deficiency and provide your warranty documents. After you move in, our team remains your point of contact.

How long it takes

Typical for this kind of project in the GTA. Permits are the least predictable part, especially if a variance is needed.

  1. Design and drawings 3–6 wk
  2. Permit 4–10 wk
  3. Construction 8–14 wk
Typical overall: 15–30 weeks.

Good to know before you start

  • Second and third units are allowed

    Provincial rules let most detached, semi-detached and townhouses in urban areas have up to three units, and those units are exempt from development charges.

  • Egress is non-negotiable

    Every bedroom in a basement needs a window or door that meets the code’s size and sill-height rules. That often means cutting the foundation and adding a window well.

  • Low ceilings have options

    Underpinning lowers the floor by deepening the footings. A bench footing is cheaper but uses floor space. Our guide explains when each makes sense.

Common questions

Do I need a permit to finish my basement?

In most GTA municipalities, yes, for new walls, plumbing or a second unit. A permit protects you at resale and makes insurance claims straightforward, and we prepare and submit it for you.

Can I legalize an existing basement apartment?

Usually. We assess what’s there against the building and fire codes, then quote the upgrades needed: typically egress windows, fire separation, interconnected alarms and sometimes electrical.

Book a legalization assessment

How high does the ceiling need to be?

For a second unit in an existing house, the code’s compliance alternatives generally allow about 1.95 m clear under beams and ducts; new construction requires more. We measure before we design, and if the basement is too low, underpinning or a bench footing can add height.

What about a separate entrance?

Most legal suites need one. A side-yard walk-down with a new door in the foundation is common. It has to meet setback and drainage rules, which we check during design.

What if my basement gets damp?

We find and fix the source first, whether that’s grading, downspouts, foundation cracks or a failed waterproofing membrane. Finishing over moisture is the most expensive mistake a basement can make.

Does a legal suite pay for itself?

Often, over time. It depends on construction cost and local rents. Our basement cost guide walks through the numbers, and we can price your basement after a site visit.

Get a basement quote

Have a question we didn’t cover? Our team is happy to talk it through.

Further reading

Have a project in mind?

Book a consultation with our team. We’ll assess your home, review the options with you and follow up with a detailed written quote.