Building and renovating in Markham
Our office is on Steelcase Road, so Markham is where we’re most often on site, and where we can be at your house the same day.
Book a site visit in Markham
Markham’s housing is younger than Toronto’s but just as varied: 1970s and 1980s split-levels and two-storeys in Thornhill and Milliken, 1990s family homes in Unionville and Berczy, New Urbanist streets in Cornell, and estate lots in Angus Glen and Devil’s Elbow. Each era has its own renovation pattern, and we’ve worked in most of them.
Markham also has one of the largest Chinese-Canadian communities in the country. We can walk you through a project in Mandarin as well as English, and the plans, quote and schedule are written so the whole family can follow them.
Neighbourhoods we work in
Unionville, Markham Village, Cornell, Berczy, Cachet, Angus Glen, Milliken, Thornhill, Bayview Glen, Wismer, Greensborough, Cathedraltown.
What Markham houses are like
What we usually find in each era of house, and the work it tends to need.
- 1960s–1980s
- Bungalows, backsplits and two-storeys in Thornhill, Bayview Glen and Markham Village. Common work: opening the main floor, new kitchens, basement suites, and full rebuilds on the larger lots.
- 1990s–2000s
- Two-storey family homes in Unionville, Berczy, Cachet and Milliken. Common work: kitchens and ensuites original to the house, closed-off family rooms, and finished basements that need a second unit.
- 2000s onward
- Cornell, Wismer and Cathedraltown. Mostly interior upgrades, basement finishing and garage or coach-house suites where the lot allows.
Local rules that can affect your project
These are what most often change the design, cost or timing of a Markham project. We check each one before any drawings are made.
-
Tree permits from 20 cm
Markham’s Tree Preservation By-law (2023-164) requires a permit to injure or remove a private tree 20 cm or more in diameter at breast height. That includes root damage from excavation, so tree protection belongs in the design.
-
Four heritage districts
Unionville, Markham Village, Thornhill and Buttonville are Heritage Conservation Districts. Exterior changes, additions and new houses inside them need heritage approval as well as a building permit.
-
Second and third units
Provincial rules allow up to three units on most residential lots, as long as the zoning by-law’s setbacks and the building code are met. A legal basement suite is the most common route in Markham.
-
Ravines and valleys
Lots backing onto the Rouge River or its tributaries can fall within Toronto and Region Conservation Authority regulated areas, which need a TRCA permit before construction.
Projects near Markham
What we build in Markham
- Custom homesNew homes built on your lot, from feasibility and drawings to the final walkthrough.
- Home additionsSecond storeys, rear extensions and garage conversions that look like they were always there.
- Whole-home renovationsGut renovations and layout changes for houses that have good bones and the wrong floor plan.
- Kitchen renovationsKitchens planned around how you cook, including wok and second kitchens with ventilation that works.
- Bathroom renovationsBathrooms waterproofed properly, ventilated properly and finished to last.
- Basements and second suitesFinished basements and legal second units, with waterproofing, egress and fire separation done right.
- Laneway and garden suitesDetached backyard homes for family or rental income, from eligibility check to occupancy.
- Trades and repairsDrywall, flooring, tile, painting, interlock and more, done by the specialists we trust.
Reading for Markham homeowners
Planning a project in Markham?
Book a consultation with our team. We’ll assess your home, review the options with you and follow up with a detailed written quote.







