Framing & Structural

Precision wood and steel framing for new builds, additions, and renovations across the GTA.

Framing is the skeleton of every project. Whether it's a new custom home, a second-storey addition, or a structural wall removal, we build frames that are square, plumb, and engineered to carry the loads above. Our licensed crew works from structural drawings and coordinates with inspectors at every stage.

Why Choose EZU for Framing?

Why Choose EZU for Framing?

  • -Licensed framing crew with custom home and addition experience
  • -Works from engineering drawings — no guesswork
  • -Inspections coordinated at every required stage
  • -Wood and light-gauge steel framing capabilities
  • -Clean, organized sites that keep subsequent trades on schedule

Essential Considerations

Structural Engineering

Load-bearing changes, additions, and beam installations require stamped engineering drawings. We coordinate engineers and ensure framing matches specs exactly.

Permits & Inspections

Framing inspections are required before walls are closed. We schedule and pass all required inspections on the first visit.

Material Selection & Moisture

We specify kiln-dried lumber where required and protect framing from weather exposure during construction.

Coordination with Trades

Framing sets the schedule for all subsequent trades. We communicate openings, chases, and blocking requirements so nothing gets missed.

Our Framing & Structural Process

  • Drawing Review

    We review architectural and structural drawings, confirm material lists, and identify any conflicts before work begins.



  • Foundation & Layout

    We establish layout lines, confirm anchor bolt positions, and begin sill plate installation.



  • Wall & Floor Framing

    We frame walls, floors, and stairs in sequence, coordinating with the framing inspection at the required stage.



  • Roof Framing & Sheathing

    We complete roof structure, install sheathing, and ensure the building is weathertight before other trades begin.


Our Recent Framing & Structural Projects

Custom home framing in progress

Custom Home Framing

Complete framing package for a 3,200 sq ft custom home in Markham.

View Projects
Second storey addition framing

Second Storey Addition

Full second-storey addition framing integrated with existing structure.

View Projects
Structural beam installation

Structural Wall Removal

LVL beam installation for open-concept main floor conversion.

View Projects

Framing & Structural FAQ

Do I need engineering drawings for framing?
For any structural change, addition, or load-bearing work — yes. We coordinate engineers and ensure drawings are permit-ready.
What is light-gauge steel framing?
Light-gauge steel studs are used in commercial and some residential applications where non-combustible construction is required. We work in both wood and steel.
How do you handle existing load-bearing walls?
We identify bearing walls, design the temporary support, install beams to proper specifications, and coordinate the structural inspection.
Can you frame around unusual or complex roof lines?
Yes. We handle hip roofs, dormers, cathedral ceilings, and complex roof geometries — working from engineer-stamped drawings.

Let's make your dream a reality.

Ready to transform your space? Our expert team is standing by to bring your vision to life with quality craftsmanship and exceptional service.

or call us at (647) 766-9999
Free Consultation
No Obligation
Fast Response
Call UsFree Quote