Professional residential roofing installation, replacement, and repair for GTA homes.
A failing roof puts everything below it at risk. We install, replace, and repair residential roofs in the GTA — asphalt shingles, architectural shingles, flat roofing membranes, and metal roofing — with proper underlayment, ventilation, and flashing details that protect your home for decades.

Inadequate attic ventilation causes ice dams, premature shingle failure, and moisture problems. We assess and correct ventilation as part of every roof replacement.
Ontario Building Code requires ice-and-water shield at eaves and valleys. We install it correctly and extend it where icing conditions demand it.
Most roof leaks originate at chimneys, skylights, and wall-to-roof intersections — not through the shingles. We replace or re-flash all penetrations.
We inspect sheathing during tear-off and replace any rotted or delaminated sections before new roofing goes down.

Complete tear-off and replacement of a 3,000 sq ft GTA home with architectural shingles.
View Projects
TPO membrane installation on a low-slope addition roof with proper drainage and insulation.
View Projects
Chimney re-step-flashing and counter-flashing to resolve chronic leak at a 1960s chimney.
View ProjectsReady to transform your space? Our expert team is standing by to bring your vision to life with quality craftsmanship and exceptional service.