Building legal, income-generating secondary suites within your existing home.
Secondary suites — whether in a basement, above a garage, or carved from existing main-floor space — are one of the most financially effective investments a GTA homeowner can make. We design and build OBC-compliant secondary suites that pass all inspections, generate real rental income, and integrate cleanly into your home.


OBC-compliant basement suite with fire separation, egress windows, separate entry, and independent mechanical systems.

Suite built above an existing or new garage, providing complete separation from the main residence.

A self-contained suite carved from main-floor space — ideal for multigenerational families needing accessible, single-level accommodation.
OBC requires fire-rated separation between the suite and the main dwelling. We build this correctly from the start — it cannot be retrofitted cheaply.
Every bedroom in a secondary suite requires a minimum-sized egress window. We factor this into the design and confirm window sizing before construction.
Legal suites require independent heating, electrical panels, and metering in most municipalities. We plan mechanical separation from day one.
Some GTA municipalities require secondary suite registration. We advise on local requirements so you can rent legally and insure the unit properly.

Two-bedroom legal suite with separate entry, full kitchen, and $2,100/month rental income.
View Projects
A main-floor bedroom wing converted to a self-contained accessible suite for a multigenerational family.
View Projects
500 sq ft suite above an existing double garage with private external staircase and separate utility metering.
View ProjectsReady to transform your space? Our expert team is standing by to bring your vision to life with quality craftsmanship and exceptional service.