Energy-efficient window and door replacement and installation for GTA homes.
Windows and doors are the largest source of heat loss in most GTA homes. We supply and install ENERGY STAR certified windows and doors — casements, sliders, picture windows, patio doors, entry doors, and more — with proper flashing, air sealing, and trim to ensure long-term performance.

ER (Energy Rating) and U-factor matter more than marketing claims. We specify windows with ratings appropriate for Ontario's climate zone.
Most window failures start with improper flashing, not window quality. We flash every opening correctly — sill pan, jambs, and head — before installation.
The gap between the window frame and rough opening must be air-sealed with low-expansion foam and tape. We treat this as a non-negotiable step.
We complete casing, sills, and exterior trim to match your home's existing style — the installation looks finished, not patched.

22-window replacement project with ENERGY STAR triple-pane units — significant reduction in drafts and heating bills.
View Projects
Insulated fibreglass entry door with sidelights and transom — improved security, insulation, and curb appeal.
View Projects
8-foot sliding patio door with Low-E glass and thermal break frame replacing a dated unit.
View ProjectsReady to transform your space? Our expert team is standing by to bring your vision to life with quality craftsmanship and exceptional service.