Garage Conversions

Converting attached or detached garages into living space, home offices, studios, or rental suites.

An underused garage is one of the most cost-effective spaces to convert in the GTA. Converting a garage into a legal suite, home office, gym, or studio adds significant value without the cost of a full addition — because the structure and roof already exist. We handle design, permits, insulation, mechanical, and finishes.

Why Convert Your Garage with EZU?

Why Convert Your Garage with EZU?

  • -Significant value add at a lower cost than a full addition
  • -Legal suite conversions that comply with OBC requirements
  • -All trades in-house: electrical, plumbing, HVAC, insulation
  • -Permit management included — we handle all submissions
  • -Fast turnaround: most conversions complete in 8–14 weeks

Garage Conversions Options

Legal Suite Conversion

Legal Suite Conversion

Converting a detached or attached garage into a legal accessory dwelling unit with kitchen, bathroom, and egress windows.

Home Office & Studio

Home Office & Studio

Transforming a garage into a fully insulated, soundproofed, and temperature-controlled home office or creative studio.

Gym & Recreation Room

Gym & Recreation Room

Purpose-built gym space with rubber flooring, high ceilings, and proper ventilation — separated from the main house.

Essential Considerations

Structural Assessment

Garage slabs are typically not insulated and may need to be built up or replaced. We assess existing conditions before committing to a scope.

Insulation & Thermal Envelope

Garages have minimal insulation. Proper wall, ceiling, and slab insulation is essential for year-round comfort in Ontario's climate.

Permits & Zoning

Converting a garage to living space always requires a building permit. We confirm zoning compatibility and manage the full permit process.

Mechanical Systems

New suites or offices need independent electrical panels, heating/cooling, and plumbing where applicable. We plan mechanical systems from the start.

Our Garage Conversions Process

  • Assessment & Design

    We assess the existing structure, confirm zoning eligibility, and design the converted space to your intended use.



  • Permits & Pre-Construction

    We submit for building permits, finalize material selections, and coordinate utility connections as required.



  • Structural & Mechanical Rough-Ins

    We upgrade insulation, complete electrical and plumbing rough-ins, and address any structural modifications required.



  • Finishes & Handover

    We install drywall, flooring, fixtures, and trim, then complete inspections and final walkthrough.


Our Recent Garage Conversions Projects

Converted garage rental suite

Garage to Rental Suite

A detached garage converted to a 400 sq ft legal rental suite generating $1,800/month.

View Projects
Garage converted to home office

Garage Home Office

A double garage converted into a soundproofed, fully climate-controlled home office and meeting room.

View Projects
Garage converted to home gym

Garage Gym Conversion

Single garage converted to a private home gym with rubber flooring, mirrors, and dedicated electrical.

View Projects

Garage Conversions FAQ

Can I legally live in a converted garage in Ontario?
Yes, if the conversion meets OBC requirements for minimum ceiling heights, egress, fire separation, and mechanical systems. We design conversions to be fully code-compliant.
How much does a garage conversion cost?
Garage conversions typically cost $60,000–$120,000 depending on the intended use, existing conditions, and whether plumbing is required.
Do I need a permit to convert my garage?
Yes. Converting a garage to any form of living space always requires a building permit. We manage the full permit process.
Will converting my garage affect my property value?
A well-executed, permitted conversion almost always adds value — especially in the GTA where additional living space and rental income are highly prized.

Let's make your dream a reality.

Ready to transform your space? Our expert team is standing by to bring your vision to life with quality craftsmanship and exceptional service.

or call us at (647) 766-9999
Free Consultation
No Obligation
Fast Response
Call UsFree Quote