Not sure of your needs? See all services or contact us.

A custom home in Vaughan

A detached home built from the foundation up, with coffered ceilings, book-matched stone and millwork designed for the rooms it sits in.

White kitchen with glass-front upper cabinets running to a coffered ceiling, marble island and stone slab range wall
Project
New custom home
Location
Vaughan, ON
Completed
2025
Home
Detached, two storeys
Style
Transitional

This house was built new on its lot, so every room could be planned around how the family actually lives rather than adapted from an existing floor plan. The brief was a traditional, finely detailed interior that would still feel bright: white painted millwork, natural stone, and ceilings with enough height to carry layered trim.

The kitchen is the centre of the main floor. Glass-front upper cabinets run to the ceiling, the range wall is clad in a single book-matched slab with a brass-banded hood, and the island carries a marble top over painted panelled cabinetry.

In the living room and the office the same language continues: stone fireplace walls with linear fireplaces, built-in shelving on either side, and coffered or tray ceilings with recessed lighting set into the coffers rather than scattered across a flat ceiling.

Completed and signed off by EZU Construction in 2025.

Planning something similar?

Book a consultation with our team. We’ll assess your home, review the options with you and follow up with a detailed written quote.