Not sure of your needs? See all services or contact us.

A bright transitional kitchen in Etobicoke

White shaker cabinetry, a quartz waterfall island and a white oak hood, with lighting built into the cabinets instead of added afterward.

White shaker kitchen with marble-look quartz waterfall island, white oak hood and brass pendant lights
Project
Kitchen renovation
Location
Etobicoke, Toronto
Completed
2023
Duration
10 weeks
Area
About 300 sq ft

The homeowners wanted a kitchen that felt calm and bright without being stark. The answer was a restrained palette, white painted shaker doors, marble-look quartz and brushed brass, warmed up with white oak in two places: the range hood and the open shelving.

The quartz runs from the counters up the walls as a full-height backsplash, so there are no grout lines behind the cooktop or sink. The island is a single waterfall piece with the prep sink set into it, facing the room.

Lighting was planned with the cabinetry rather than after it. The glass-front cabinets have interior lights, the shelving has lighting above it, and recessed pot lights handle general light. The result is a room that works at night as well as it does in daylight.

Completed and signed off by EZU Construction in 2023.

Planning something similar?

Book a consultation with our team. We’ll assess your home, review the options with you and follow up with a detailed written quote.