Not sure of your needs? See all services or contact us.

Opening up a dark kitchen in Richmond Hill

Dark cherry cabinets and black granite replaced with tall white cabinetry, a long island and a lighting plan that finally reaches the corners.

White kitchen with tall cabinetry, a long island with dark stone top and refinished hardwood floor
Project
Kitchen renovation
Location
Richmond Hill, ON
Completed
2024
Duration
5 weeks
Area
About 300 sq ft

This kitchen had good bones and a good size, but dark cherry cabinets, black granite and dated pendants made it feel closed in. The family wanted it lighter and easier to keep tidy, without losing the generous storage they were used to.

New white cabinetry runs taller than the original to add storage at the top, and integrated panels on the refrigerator keep the long wall calm. The island kept its central position and gained a dark stone top, which carries a little contrast through the room and hides daily wear better than a white surface would.

The original hardwood was refinished rather than replaced. It was in good condition under the wear, and refinishing it saved budget for the cabinetry and lighting.

Before and after

Original kitchen with dark cherry cabinets, black granite and cluttered counters
Before
Renovated kitchen with white cabinets and dark stone island top
After
Dark cherry and black granite replaced with full-height white cabinetry and a stone-topped island.

Completed and signed off by EZU Construction in 2024.

Planning something similar?

Book a consultation with our team. We’ll assess your home, review the options with you and follow up with a detailed written quote.