Not sure of your needs? See all services or contact us.

A whole-home renovation in Toronto

A house renovated throughout as one design: a charcoal and walnut kitchen, a curved open stair, wide-plank floors and refined bathrooms.

Charcoal kitchen with fluted walnut band, walnut waterfall island and geometric brass pendants
Project
Whole-home renovation
Location
Toronto, ON
Completed
2025
Kitchen
About 400 sq ft

The family loved the house but not its interior: a dated maple kitchen, tile floors that broke the main floor into separate zones, and finishes from room to room that never quite matched. The brief was a home that felt cohesive from the front door to the bedrooms.

The kitchen became the centrepiece. Cabinetry runs floor to ceiling in matte charcoal with brass pulls, broken by a band of fluted walnut that ties the wall units to the hood, and the island pairs a stone-topped working block with a long walnut waterfall table where the family sits.

Beyond the kitchen, wide-plank engineered hardwood runs through the main floor, and a curved open stair with wrought-iron balusters and a stained rail rises to a gallery landing. Upstairs, the ensuite has a floating double vanity and backlit mirrors, and the powder room is finished with a dark textured feature wall.

Lighting was planned room by room, with pot lights for general light and sculptural pendants over the stair and landing. The result is a house that reads as one design, with the same materials and level of detail from the entry doors to the ensuite.

Before and after

Original kitchen with maple shaker cabinets, curved island and beige floor tile
Before
Renovated kitchen with charcoal cabinets and walnut island
After
Same room, same footprint. The layout stayed; the storage, island and finishes didn’t.

Completed and signed off by EZU Construction in 2025.

Planning something similar?

Book a consultation with our team. We’ll assess your home, review the options with you and follow up with a detailed written quote.